How to raise your rate with existing clients
A rate raise is a date and one number for work you have not started. It is not a new invoice for the project you already signed, and it is not a paragraph about your rent. Clients can accept a future price. They fight a surprise on a job that is already underway.
Pick the number on the freelance rate calculator before you write the email. If the floor is $118 and you have been charging $75, a “small” 10% raise still leaves you short. Send the floor, or send nothing.
When to send it
- The next project is about to be scoped, and the last one closed cleanly.
- You are turning work away, or utilization is already near 70%. The calendar is full at a price that does not fund the year.
- A new year, or a new scope that is genuinely a different job. Do not invent a reason. The date is the reason.
Do not raise in the middle of a signed scope. Finish that price. Extra work inside it is a change order, still at the old rate. The new rate starts on the next yes.
The email
Use this when you want to keep the client and you have a real floor.
“From DATE, new work is $X an hour, and a day is $Y. Anything we have already scoped stays at the price we agreed, through delivery. I’ll quote the next project on the new rate. Reply if you want that quote, and I’ll send it before we start.”
One number. One date. The old work is explicitly safe. A menu of three rates invites them to pick the cheapest one and call it a compromise.
When they say the old rate was fine
“It was fine for a lighter calendar. I’m not taking new work at that number after DATE. We can finish what is signed, and the next project is $X. If that no longer fits, I understand — I won’t stretch the old price to keep the slot.”
Then stop typing. A second paragraph about how awkward this feels is a discount offer. Silence after a clear number is part of the message.
What not to write
- “I hope that’s okay.” You are informing them, not applying.
- An essay about inflation, software, or your costs. They did not ask for your books. The calculator already used those.
- “I can do $80 if that’s easier.” You just named your real rate, and it is $80.
- A raise that applies backward to hours you already logged. That is a dispute, not a policy.
Where the number comes from
Open the rate calculator and leave take-home, tax, and expenses alone. Move utilization to match the week you actually have.
Defaults on that page: $72,000 take-home, 30% tax as a planning figure, $6,000 expenses, 10% buffer, 46 weeks, 40-hour weeks. At 55% billed the floor is about $118 an hour. At 70%, when work is already waiting, it is about $93. A client paying $75 is below both. If you are already booked, $95 is the least you can say out loud. If you are still hunting every week, set utilization to 40%: the same life needs about $163, because the unpaid search time is part of the rate.
Tax in that field is not a filing. It is the percent you refuse to pretend is zero. Confirm the real bracket with an accountant where you live.
Put the new floor into the project quote calculator for the next scope, so the email and the quote say the same figure. The written card you attach, instead of another explanation, is the Rate Card System.