What is a day rate, and how it compares to hourly
A day rate is a price for one calendar day of your attention, not eight hours times your hourly number. These are three ways to sell the same floor. The floor is the number from the freelance rate calculator — what you must earn per billed hour after unpaid time and tax. How you say that number to a client is a different decision.
Pick the shape that matches the work, not the shape that feels polite.
Hourly
You sell minutes. Good when the brief will change while you work: a rescue, a “sit with us in the file,” an unknown codebase. Bad when the client can invent tasks faster than you can invoice them.
- Lead with a minimum (10 hours, or your Pulse package), not a naked hourly.
- Bill in 30-minute steps. Fifteen-minute lines look like you are nickeling them and still lose money on context-switch.
- Cap the week. “Up to 12 hours this week, then we re-quote” is a fence. Open-ended hourly is a second job.
Hourly is a measuring stick. It is a weak offer. If they ask “what’s your rate?” answer with the floor and immediately convert: “That is the floor. Most work is a day or a fixed project. Tell me the outcome.”
What is a day rate?
A day is not 8 × hourly. You do not give them eight billable hours. You give them a block of your calendar: morning context, one deep stretch, a wrap. Price a day as hourly floor × 6, not × 8. The other two hours are the unpaid edges that always attach to a “day on site” or a “day in Slack.”
How many hours is a day rate? Six billable hours. If the rate calculator says $120, the day is $720. A half-day is 0.6 × that day, not half, because the start-up cost of the day does not shrink. “What are day rates?” in a niche is just this math with someone else’s floor. Copying their number without your tax and unpaid hours is how people undercharge on purpose.
Use a day rate when:
- They want you present, not a deliverable in a folder.
- The work is a workshop, a pairing day, a launch-day steward.
- You would otherwise leak hours into “while you’re here.”
Write what a day includes and what it does not. One day is not an open retainer. A second day is a second line, not a discount because “we already started.”
Half-days: 0.6 × day, not 0.5. The commute of attention is the same.
Project fee
You sell an outcome with a fence. This is the default for anything you can describe as done: a site, a deck, a research memo, a brand-adjacent kit. The quote calculator exists for this: production hours + revisions + risk + rush, then a 40% deposit.
Project fees fail when the scope is a vibe. If they cannot name the artifact, do not force a fixed number. Sell a paid discovery day, then a project. Two invoices. One adult conversation.
Never defend a project fee with “it will only take me ten hours.” Defend it with what is in, what is out, and how a change order works. That document is the scope of work, not a chat thread.
How to convert without lying
Say your floor is $120/hour after the calculator.
| Shape | Math | What you send |
|---|---|---|
| Hourly | $120, 10-hour minimum | Floor + cap on the week |
| Day | $120 × 6 = $720 | One calendar day, listed inclusions |
| Half-day | $720 × 0.6 = $432 | Same fence, shorter block |
| Project | Hours × $120 × risk, as a single number | Scope + deposit |
If a project quote comes out under 10 × your floor, it is not a project. It is a Pulse package or a decline. Tiny jobs have the same kickoff cost as real ones.
What to put in the email
Do not send three prices and ask them to choose like a brunch menu. Send the shape that fits, plus one alternate:
“This is a fixed project at $X, 40% to start. If you would rather buy my calendar instead, the day rate is $Y. I do not open a file below $Z.”
The sentences for discounts and the three-tier card live in the Rate Card System. The proposal and change order live in the Client Close Kit.